How Houston took over its water works in 1906

From a private company pumping Buffalo Bayou in 1879 to artesian wells and city ownership in 1906, plus the 1902 sewer system that came first.

Turn on a tap in Houston today and you are a customer of a city department. It was not always so, and the date it started is 1906, when the city bought the private company that had supplied its water for a generation. The road to that purchase is a Houston classic: a young city outgrowing its pipes, an investor-owned utility, a muddy bayou that served as both water supply and sewer, and a find underground that changed the whole calculation.

A company from New York

In 1878 the city gave a franchise to the Houston Water Works Company, formed by a group of New York investors. The company dammed Buffalo Bayou upstream from Capitol Avenue and built a processing plant on Artesian Street, with connections into the city's system. The plant opened in 1879 and drew about 2 million gallons of water a day from the bayou, partly so the city could fight fires.

That plant is a surviving landmark. The 1879 Houston Waterworks building at 27 Artesian Street went onto the National Register of Historic Places in 1976 and became a Texas State Antiquities Landmark in 1981. Little of the original remains. A 1975 survey found a masonry reservoir with a concrete cover and the possible foundation of the old pump house, on the grounds of the 1926 Bayou Pumping Station. The site is a reminder that for its first decades Houston drank from the same stream on which it was founded.

The trouble with the bayou

Buffalo Bayou made a poor water source for a growing city. It took the runoff and waste of the town upstream and downstream, and the company's pumps drew from it anyway. The state historical handbook says citizens in the late 1880s found artesian water by drilling shallow wells, and that this replaced the contaminated bayou water from the privately owned company.

The company changed hands in 1884, when T. H. Scanlan and Associates acquired it and raised the plant's daily capacity to 8 million gallons. Pressure still ran uneven in parts of the city. Then, in 1887, a well struck a large natural reservoir of water underground. By 1891 the company had fourteen wells in service. For a flat coastal city with a polluted stream, the artesian discovery was a stroke of luck: clean water lay beneath the clay, within reach of a drill.

The luck did not end the arguments. In the 1890s the Houston Daily Post ran a series of investigative articles about the water company and the pollution of the bayou, and its reporting raised the suspicion that the company was mixing bayou water with the groundwater it sold. The city's later purchase of the system ended that dispute. The part newspapers played in those years is described in houston's newspapers and radio before 1930.

The numbers, side by side

Line the figures up and the growth is easy to follow. The plant of 1879 drew about 2 million gallons a day. By 1884 the new owners had lifted capacity to 8 million gallons a day, a fourfold increase in five years, and still pressure was uneven in parts of the city, which tells you how fast demand was climbing. The first well in 1887 was followed by fourteen in service by 1891, better than three new wells a year on average. By 1906 the system the city bought had 55 wells. From fourteen wells to fifty-five in fifteen years is nearly a quadrupling, while the supply from the bayou faded into the background. The mains reached 65 miles.

The figures also explain why a buyout was possible. A city that wants to own a utility needs a utility that has stopped changing every year. By 1906 the shape of Houston's water supply, a field of wells feeding a network of mains, was settled enough to value and to buy.

The sewer that came first

The sewer system was its own project with its own trigger. The Army Corps of Engineers required Houston to build a sewage-disposal system, and the city completed it in 1902. The state historical handbook calls it among the best in the nation. The requirement came from the federal government's interest in the navigable bayou: raw sewage dumped into a stream the Corps managed was a problem for the channel as well as for the people living beside it.

Sewer and water supply were two sides of one problem. A city that drew its water from the bayou and sent its waste to the bayou had a public health issue that private enterprise had little reason to solve. Houston's answer was to build the sewer with municipal money and then to move on the water.

Why the timing worked

Look at the sequence and a pattern emerges. The sewer came in 1902, the arbitration board in 1903 and the purchase in 1906, so the city spent four years moving from a federal order about its waste to ownership of its supply. Each step made the next one easier. Once the city was running its own sewer, it had the staff, the bonds and the habit of treating water and waste as public business, and a private company charging customers for water of doubtful origin was an awkward neighbor to that habit. The valuation set the price, and the city's decision to buy followed from a utility whose shape was finally clear.

The wells made the case in the plainest terms: clean water was under the ground, and the question was who would own the system that brought it up.

1903 to 1906: valuing the plant

The city could not simply take the company. First it needed a valuation. In 1903 a board of arbitration was formed to decide what the water works was worth so the city could buy it, and the figure under discussion was in the neighborhood of $800,000. The purchase was completed in 1906. The city bought a water works plant, 55 wells and 65 miles of water mains for roughly $900,000.

Stop on those numbers a moment. Fifty-five wells and sixty-five miles of main were the bones of a municipal system. The price looks modest by later standards. It also showed how far city government had come since the nineteenth century. A city that had run on aldermen and private franchises was ready to own a core utility.

The state handbook confirms the main point: the city took over the water company in 1906 and quickly expanded its artesian wells. After the takeover the city was both owner and operator, which meant it also took on responsibility for the next hundred years of growth.

What municipal ownership meant

Public ownership of the water system changed three things.

First, the incentives. A private company earns money by selling water, and a city earns public approval by delivering it safely. When the water was clean, the two aims lined up. When bayou water got mixed in, they did not.

Second, capital planning. After 1906 the city could issue bonds for wells, mains and plants. The bonds in turn tied the water system to the city's credit and its political process, a link that survives in the annual budget and in the water rate decisions that go before the city council.

Third, the long-term supply. The artesian wells were the first answer, and the city expanded them quickly. They were also the start of a longer problem. A city that pumps groundwater out of a coastal plain for decades can watch the land itself sink, which is the subject of sinking ground, subsidence and the switch to surface water. In the decades after the takeover the region eventually turned to surface water, with Lake Houston coming online in 1954.

From 1906 to the water bill

The modern water system grew out of the 1906 decision. The department that runs it today is Houston Public Works, responsible for water and wastewater, streets and drainage, and engineering. The department says it serves more than 2.3 million residents, the modern scale of a utility that began with 55 wells and 65 miles of main. Its website is at houstonpublicworks.org, and its overview is in Houston Public Works. The department lists a Water Bill Improvement Plan among its featured programs, and the practical details of the water bill, from reading it to paying it, are in Start water service and read your Houston water bill.

A modern consequence shows up in the finances. In the city's FY2027 budget, a rental fee on water and wastewater rights-of-way worth $104 million was part of the mayor's proposal, one more way the water system is tied to the city's general finances. The fee is discussed in The right-of-way fee on Houston water and wastewater. The same budget moved Solid Waste into the Combined Utility System, a sign that the city still treats its utilities as a single enterprise.

Dates to remember

  • 1878: The Houston Water Works Company receives a franchise from the city.
  • 1879: The company's plant on Artesian Street opens, drawing about 2 million gallons a day from Buffalo Bayou.
  • 1884: T. H. Scanlan and Associates acquire the company; capacity rises to 8 million gallons a day.
  • 1887: A well reveals a large natural reservoir of water.
  • 1891: Fourteen wells are in service.
  • 1890s: Newspaper investigations question the company's handling of bayou water.
  • 1902: The sewage-disposal system required by the Army Corps of Engineers is completed.
  • 1903: A board of arbitration is formed to value the system.
  • 1906: The city buys the system, with 55 wells and 65 miles of mains.
  • 1954: Lake Houston begins supplying surface water.
  • 1976: The 1879 plant is listed on the National Register of Historic Places.