Guides
Getting a building permit in Houston
The Houston Permitting Center handles plan review and inspections, floodplain review and right of way permits; there is no zoning permit to seek first.
Most American cities ask a builder to clear zoning first and a building permit second. Houston skips the first step, because the city has no zoning, and routes nearly everything else through one place: the Houston Permitting Center. The center, which opened in June 2011, combines most of the city's permitting and licensing so that builders and owners do not walk between departments. This guide explains what the center's pages say about building permits, plan review, inspections, floodplain review and right of way permits, and how the no-zoning rule changes the order of operations. Fees, forms and timelines change, so the center's own pages are where to confirm them, and this guide quotes none.
Who does what inside the center
The Houston Permitting Center's website describes several functions.
- Building Code Enforcement handles permits for private building construction, plan review, sign administration and inspections. Its inspection types include electrical, mechanical, plumbing, structural, multi-family habitability and occupancy.
- The Floodplain Management Office permits all construction within the city's Special Flood Hazard Area and offers guidance on elevation certificates.
- The Office of the City Engineer handles right of way permits and right of way traffic and mobility services. These matter if work touches a street, a sidewalk or the public right of way, including street cuts.
- Infrastructure and Development Services is the third part of the center, alongside Building Code Enforcement and the Office of the City Engineer, which also covers street cuts and storm water.
Other city departments have a role in specific projects. The Planning and Development Department regulates platting and development in the city and its extraterritorial jurisdiction, and its pages cover sidewalk requirements, off-street parking and carport permits. Houston Public Works lists permits among its functions and runs the water and wastewater systems that a new building connects to.
Why there is no zoning permit
Houston does not have zoning. The city's development codes address how property is subdivided, not what it may be used for. That means a builder does not apply for a zoning approval or a variance for a use. Instead the city checks the building, its structure and safety, its relation to the floodplain, its connection to streets and utilities, and the plat. What a neighborhood permits, such as only single-family homes, may come from deed restrictions that the city does not issue permits about. A permit from the city does not tell you that your plans comply with the deed restrictions on the lot. buying a home in a city with no zoning explains that private layer.
The steps for a typical project
The details vary by project, but the sequence below follows the center's description of its functions.
- Confirm the property. Check the plat, any deed restrictions, any minimum lot size or building line designation, and whether the lot is in a historic district. A historic district means the Houston Office of Preservation and the Historic Commission review new construction, demolition and alterations.
- Check the floodplain. If the property is within the Special Flood Hazard Area, the Floodplain Management Office permits the construction, and elevation questions apply. Houston sits on a flat coastal plain crossed by bayous, and floodplain review is a major part of building here.
- Prepare plans. For commercial structures, the center offers appointments for structural, mechanical-electrical-plumbing (MEP) and stormwater drainage plan reviews. Residential projects follow the center's instructions for what to submit.
- Apply through the online systems. The center lists iPermits and ProjectDox as the online permitting systems, and applicants can check plan review and inspection status online.
- Get the permit and build. Work should not begin before the permit is issued; the center's pages say what must be posted or available on site.
- Schedule inspections. The center's page says inspection status can be checked using an 8-digit project number. Inspections follow the building's progress, and an occupancy inspection comes at the end of a project that needs one.
A hypothetical example
Say an owner wants to add a room to a house that sits inside the Special Flood Hazard Area. The owner first reads the deed restrictions and the plat for any building line. The project then needs a building permit through Building Code Enforcement, and because of the location it also needs floodplain review by the Floodplain Management Office. If the owner also wants a new driveway apron, a right of way permit from the Office of the City Engineer is a separate application. Inspections follow as the work proceeds, and the owner can track each one with the project number. This is an illustration of how the offices divide the work, not a guide to any particular project's requirements.
Right of way and street work
If your project includes a driveway apron, a street cut, a sidewalk or work in the public right of way, the Office of the City Engineer's right of way permits apply. This is a different permit from the building permit and has its own review. The city also keeps a Major Thoroughfare and Freeway Plan, updated annually, that preserves right of way for future roads, so check whether a planned widening affects the property.
Signs
Building Code Enforcement handles sign administration, so a business that wants a sign should check the center before ordering one. Business owners can read Starting a business in Houston for other permits and filings.
Tips for a smoother project
- Hire licensed professionals where the rules require it. State agencies license many trades; ask the center and the relevant licensing agency what a project requires.
- Ask before you start. The center's staff are the authority on what a project needs. Questions about permits are better settled before work begins, not after an inspector finds it.
- Keep records. Save permit numbers, inspection results and approved plans. They matter when you sell, insure or refinance.
- Mind multi-family habitability. Apartment buildings are subject to habitability inspections by Building Code Enforcement.
Related city offices
- Houston Permitting Center: houstonpermittingcenter.org
- Planning and Development Department: houstontx.gov/planning, 832.393.6600
- Houston Public Works: houstonpublicworks.org, 832.395.2500
- Houston 311: 311 or 713-837-0311
For a deeper look at who handles what, the government section's entries on the Houston Permitting Center and Planning and Development Department describe the departments.